Beijing-Tianjin Highway (East Section) Contract Package V
Start: Mar.16th 2004
End: Nov. 30th 2005
The total length is 2.806km. Jet grouting pile, cement mixing pile, and rock filling methodologies were adopted for road foundation construction. The total span distance of North Ring Road Extra Large Bridge is 1.7km.

    
            