Caofeidian Ore Terminal Phase I Works
The project consists of wharf main body, bollard, steel trestle, approaching jetty, and ant frozen facility. Quay structure is high pile slab type. The two berths are 250,000.00DWT. The berths are connected with land area by two span 94m steel bridge and an approach dike. The quay length is 735m long and 31m wide. The approaching dike is made of placed rocks in a length of 184.6m. External side of the dike is placed with precast Accorodes.
Contract duration: Oct.7th 2004 – Dec.10th 2005
Contract Value: RMB¥352,160,000.00
The project was awarded of 2005 FHEC Excellent Works Prize.