Port and Waterway
Home
>
Business Overview
>
Port and Waterway
Caofeidian Coal Terminal Starting Works
Caofeidian Coal Terminal Starting Works consists of two 100000DWT berths, one 70000DWT berth, one 50000DWT berth and one 70000DWT berth with an annual passing capability is 50,000,000.00Ton.
The project is located inside the dredged port basin of 1564m long the top level is +4.5m, and front design water depth is -15.5m. the structure style is curtain type steel sheet pile.
The project was awarded of FHEC Excellent Works Prize and 2009 CCCC Excellent Works Prize.