• Company News
Company News Home   >   Company News   >   Company News

Shenzhen-Zhongshan Link Wins Top National S&T Progress Award

On July 8, 2026, the results of the 2025 National Science and Technology Progress Awards, the highest honor in China’s scientific and technological domain, were officially announced. Shenzhen-Zhongshan Link clinched the First Prize. 

As the world’s first integrated cross-sea cluster project combining bridge, island, tunnel, and underwater interchange, Shenzhen-Zhongshan Link is among the most challenging cross-sea engineering endeavors ever undertaken.

CCCC First Harbor Engineering Company (CCCC-FHEC) is the only contractor to participate comprehensively in all three core components—tunnel, island, and bridge. From early-stage feasibility studies and proprietary equipment R&D to the construction of landmark structures such as the west artificial island and non-navigable bridges, CCCC-FHEC played a pivotal role.  

The team developed the world’s first integrated floating and installation vessel for immersed tubes, integrating nine control systems and achieving millimeter-level installation accuracy for large tubes in deep water. To tackle extreme challenges such as ultra-thick underwater soft soil layers and complex open-sea conditions, CCCC-FHEC developed the world’s largest 12-hammer linked hydraulic vibrating hammer group and innovatively applied the DSM pre-treatment technology for steel cylinder foundations. In just 141 days, the team completed the vibration sinking of 57 giant steel cylinders—each 28 meters in diameter and 35 to 40 meters tall—and closed the artificial island. This included a record-breaking feat of installing four cylinders in a single day, with a 100% positioning accuracy rate, setting a new global benchmark for rapid island construction in open waters.